Thursday, April 7, 2011

HOT STAMPING

Definition:
The process where the decoration from a coloured film, printed or wood grained film or a metalized film is transferred to the surface of the part by heat, pressure and precisely controlled time interval. It is a completely dry process requiring no pre-treatment of the plastics. It requires a special machine and a heated die to apply the film, in roll form, to any thermoplastic or thermoset. Usually thermosets are not decorated in this way because melting of the surface is required for adhesion.
Process:
The heated metal or rubber die is brought into contact with the plastic under pressure. The coated film is mounted between the die and the plastic. After some time (normally less than one second) the coating releases from the carrier film and adheres itself to the plastic surface. When the die is removed, the part is completely dry and can be handled immediately.
Dies:
They are made of silicone rubber or a soft metal such as zinc, magnesium, copper or brass. Silicone rubber is frequently used because it can compensate small variation of thickness in the plastic and withstand the temperature ranging from 1200-1900C.
Films:
The decorative films used in the process are usually of two type viz.: The Roll leaf and The Heat transfers.

QA CHECKLIST DOCUMENTATION

Checklist Documentation
Here are some of the important documents included in a checklist and the vital documentation procedures that a company has to fulfil
o Quality Manual – This document includes comprehensive details related to the quality management system of an organization. It defines each procedure, process, expectation and justification if there are exclusions for a procedure. It also describes how the quality assurance checklist can help the organization monitor its records and management reviews. Generally, the quality manual - that can be either in a hard copy or soft copy form – provides a guarantee that assurance of quality has been achieved.
o The complete list of documented activities – This document helps define the appropriate measures to create, implement, endorse and review the quality processes included in the system.
o Records regulation – The regulation or control of records in an organization is necessary to establish that it satisfactorily conforms to the defined procedures. Since it helps determine and confirm if the quality programs in QA checklist are still effective, records regulation is an important aspect of the checklist.
o Management responsibilities – This record is a declaration of the company commitment to quality as well as a reference to their role in implementing quality management policies. It includes planning, communication - both external and internal - and customer focus. It also describes the responsibility and authority rules established by the management.
o Human resources – This aspect of the checklist deals with the personnel who are involved in the quality programs of the organization. It also establishes the qualifications required by the personnel to be able to ensure the competence specified in QA checklist. This section of the checklist also details the necessary education, skills, training and work experience required of each employee in order to efficiently carry out quality improvement tasks.
o Product realization – This is another significant component of the checklist that details the processes involved in manufacturing a product. Since product realization must fulfil the criteria included in the quality manual, it is a very useful guideline during the design and manufacturing process. If any deviations are found, the product will be classified as non-compliant.
o Measuring the outcome – In this part of the checklist, the organization offers evidence of performance in QA checklist activities - including how they assess, analyze, amend and advance their quality processes. This analysis of the actual outcome also shows how much the company conforms to the quality management system. This document must be able to provide proof of compliance in an easy-to-follow format such as statistical data.
1. Finished Product Inspection Report
2. Report Date:
3. Vendor Name:
4. Style :
5. Inspector Name:
6. Factory Name/Address:
7. Description:
8. Order Due Date:
9. Est. Ship Date:
10. Colour:
11. City/ State/Prov. P.O. :
12. Ship method:
13. Country of Origin:
14. Order Quantity:
15. Report accepted by:
16. (Authorized factory manager)
17. Visual Product ( ) Pass ( ) Fail ( ) Waived ( )
18. Measurement ( ) Pass ( ) Fail ( ) Waived ( )
19. Packaging ( ) Pass ( ) Fail ( ) Waived ( )
20. Overall ( ) Pass ( ) Fail
21. Visual Inspection (Visual, Construction, and Packaging)
22. Sample Size:
23. Major Defects Allowed:
24. Minor Defects Allowed:
25. List Each Defect found
26. Defect Description: Critical( ) Major( ) Minor ( )
27. Corrective Action to be taken:
28. Authorised signatory

Quality Assurance Checklist

QA PROJECT PLAN CHECKLIST:
Quality control checklists are a practical means of measuring production in a factory setting, allowing factory managers to inspect the productivity of their workers and to improve the factory's finished product. Such checklists typically record the rate of defective products and material waste as well as the time required for the completion of different tasks in an assembly line setting. Once the numbers are gathered, quality control personnel and line managers can then conduct further investigations regarding the causes and origins of product defects or low productivity. In factories, quality control checklists serve as a means of improving product quality and saving money.


Quality Assurance Checklist:
1. Every company relies on quality assurance checklist to effectively track, examine and verify all quality enhancement programs before, during and after implementation. Such a checklist is meant to provide business owners, project designers and other employees with valuable guidance in determining and planning all quality monitoring activities within the company. The checklist includes quality checking activities to be implemented throughout the product lifecycle.
The basic objectives of quality checking programs include providing the management with the necessary data that informs about the product quality and verifying that the products conform to specified standards and requirements. To fulfil these objectives and other quality standards of the company, quality assurance checklist primarily involves the following activities
o Periodic review of the quality activities by the senior management
o Regular review of the quality activities and products by independent quality professionals
o Identifying, documenting and controlling deviations in quality activities

Quality Assurance Plan

• The objective of quality assurance plan is to develop and design the activities related to quality control project for the organization. It is a composite document containing all the information related to the quality control activities. It is used to schedule the reviews and audits for checking different business components and also to check the correctness of these testing procedures as defined in the plan. The quality management team is totally responsible to build up the primary design of the plan. To develop this plan, certain steps are followed, which are described below.
o Step 1: To define the quality goals for the processes. These goals will be accepted unconditionally by the developer and the customer, both. These objectives are to be clearly described in the plan, so that both the parties can understand easily the scope of the processes. The developers might also set a standard to define the goals. If possible, the plan can also describe the quality goals in terms of measurement. This will ultimately help to measure the performance of the processes in terms of gradation.
o Step 2: To define the organization and the roles and responsibilities of the participant activities. It should include the reporting system for the outcome of the quality reviews. The quality team should know where to submit the reports, directly to the developers or somebody else. In many cases, the reports are submitted to the project review team, who in turn delivers the report to the subsequent departments and keeps it in storage for records. Whatever is the process of reporting, it should be well defined in the plan to avoid disputes or complications in the submission process for reviews and audits.
o Step 3: The subsidiary quality assurance plan: It includes the list of other related plans describing project standards, which have references in any of the process. These subsidiary plans are related to the quality standards of several business components and how they are related to each other in achieving the collective qualitative objective. This information also helps to determine the different types of reviews to be done and how often they will be performed. Normally, the included referenced plans are identified below.
 Documentation Plan
 Measurement Plan
 Risk Measurement Plan
 Problem Resolution Plan
 Configuration Management Plan
 Product Development Plan
 Test Plan
 Subcontractor Management Plan etc.
o Step 4: To identify the task and activities of the quality control team. Generally, this will include following reviews.
 Reviewing project plans to ensure that the project abide by the defined process.
 Reviewing project to ensure the performance according to the plans.
 Endorsement of variation from the standard process.
 Assessing the improvement of the processes.
It is the responsibility of the quality manager, to fix the schedule for the reviews and audits to conduct quality control. This schedule is also documented within the plan, so that task control can be done at an individual level.
Thus, the entire process of quality control is documented within the plan. This helps as a guideline for the reviewers and developers, simultaneously. For any future reference, this could be used as a practical evidence of total quality control.

PRODUCT QUALITY CONTROL

INSPECTION OF FINISHED PRODUCT














Quality assurance project plan — a formal document describing in comprehensive detail the necessary quality assurance procedures, quality control activities, and other technical activities that need to be implemented to ensure that the results of the work performed will satisfy the stated performance or acceptance criteria. The quality control checklist is an assessment tool used for measuring the value of a product. This structured questionnaire facilitates the collection and analysis of the data necessary to determine strengths and weaknesses in work quality.
Record: A completed document that provides objective evidence of an item or process. Records may include photographs, drawings, magnetic tape, and other data recording media.

Monday, April 4, 2011

SILK SCREEN COATING

Here the coating is wiped through a pattern on a screen. Originally the screens were made of silk but now it is made of nylon fabric, polyester fabric or stainless steel mesh to get longer life and better reproducibility. The process is well suited for application of two or more colours and/or patterns depending on the number of heads added on the machine. It can be used with curved and flat surfaces.
Silk screen coating is now termed as screen printing because it is used to print bottles, moulded items, flat films and extruded shape. The basic components of the screen printing system are: 1. Screen, 2. Frame to hold the screen 3. Squeegee.
1. Screen: Nylon screens are preferable for plastic but with hot inks stainless steel must be used. Split screens are used for simultaneous printing of two colours.
2. Frames: Although most frames are made of wood, metal frames are desirable because the metal frames have longer life and they do not warp. Specially operated frames, stretching all the four sides of the screen simultaneously are available to increase the mesh life.
3. Squeegee: Its blades are best if they are made of resilient rubber or plastic. The shape of the printing edge of the squeegee determines the sharpness and deposit of ink. A double sided squeegee with a bevelled (slant) edge is used for direct printing on uneven surfaces, bottles or containers. Softer blades are recommended for rough surfaces and for depositing more colours. The blade should at least be 5 cm longer than the print. In high speed machine, the squeegee should print from either direction to prevent build up of ink on one side of the screen. Sometimes, a one way sweep is also necessary.
PROCESS:
The squeegee is pulled across the screen so that the ink is forced through the mesh to make the print. Either screen frame or the squeegee can be moved.
INKS:
Types of Ink:
1. Flame Dry Ink: It dries in seconds and do not require long dryers. They are under development and are used most widely in the dairy industry and are limited to PE.
2. Standard Inks or cold Inks: They are not to be heated before use. They are composed of a variety of material based on the type of material, gloss, product resistance and drying time. eg. PVC products require a vinyl base ink.
The ink fuses to the product in many cases; hence the adhesion in the screen printing is excellent.
Both PE and PP must be treated before being printed. Three methods are used:
1. Flame treatment: The most practical and widely used method.
2. Corona discharge and chemical methods are not widely used, but it has an advantage of not destroying the gloss of PP.
Auxiliary equipment:
1. Nest carriers: to hold objects to be printed in a special manner like printing up to the edge of the part. A vacuum system may also be used to hold the part throughout the printing and feeding.
2. Static eliminators: are placed after the feeding mechanism and ahead of the printing head. Tinsel and tinsel bars, electric static eliminator and remotely controlled ionized air units which are expensive and efficient mechanical equipments are used. Permanent and temporary anti static compounds may also be used either in the resin itself or as a coating on the product.
3. Dryers: for semi automatic unit, a flat bed oven with circulating air, heated by gas or electricity is usually used. In automatic unit oven with special nests carrying the products through an up and down configuration are desirable.
4. Un scramblers are attached to orient the bottles before placing them in the detector.
5. Automatic registration in the printing station requires a notch in the part to match the registration mark in the printing station.
6. Expandable mandrels to hold pieces with irregular inner dimensions and soft plastic or open tubes are also incorporated.
7. Automatic feed and take off and step less variable speed drive is also available.

Miscellaneous Paint Application Techniques

WIPING:
Paint wipe operation should be considered when a product with a fairly flat surface, a lower surface is to be painted. The wipe set up is an automatic operation. Its use is more expensive than the cost of a mask, but it can handle very large volume. It can also be used where very fine lettering or designs are involved, where designing a mask for the job is almost impossible. Manual wipe is only feasible where the labour cost is very low.
Automatic wipe: Here the product indexes from the paint station to a wipe station where an absorbent fabric passes over the top of the product taking the paint off the flat surface and leaving the paint in the indented parts. A light solvent spray can be used to aid in paint removal. Disposable soft paper is usually used as an absorbent fabric, however some processors also use reusable fabrics.
ROLLER COATING:
Here the raised surface of the part is coated with paint while the depressed surface of the part remains uncoated. No secondary operations are required and the process does not paint depressed surfaces when even slightly raised sections are present.
FLOW COATING:
Paint is applied from the overhead nozzles on the racked parts. The excess coating is drained off, after painting and is re circulated for use in the next cycle, thus resulting in very little waste. The process is not continuous, but many parts can be handled in a single cycle. Sharp corners should be avoided in the parts since it can result in excessive paint build up.
DIP COATING:
The part is dipped in the paint bath so as to minimize the wastage due to the overspray. Automatic system for raising and lowering the parts are used to control the uniformity of the coating thickness. Parts that entraps excessive air cannot be dip coated because they will require prolonged drain time.
FLOCKING:
It is a decorating technique also classified as a variation in painting. It involves coating of a plastic part with adhesive lacquers tinted to match the flock colour, and then the fibre (flock) is applied with a special flock spray gun. Flock imparts the appearance and feel of material such as felt (matted fibre), suede (soft or furry surface of cloth) or short napped mohair (Angora goat with long silky hair), to the plastic part.